5. INITIAL POWER ON AND CHECKOUT

This section describes the procedure for turning on the SSPB for the first time. It also describes
the steps for initial checkout of the system. Before proceeding with the steps in this section, read
it comp tely to become familiar with normal operation of the SSPB.
le
WARNING: The information presented in this section is addressed to technicians who have
specific training in, and knowledge of Microwave Power Transmitters. Inappropriate use of
the SSPB can cause harm to the operator or equipment. Do not attempt the procedures
outlined in this section before becoming thoroughly familiar with its contents.

5.1 PRE-POWER PROCEDURES

Before applying prime power to the SSPB, verify that the following conditions are met:
• The vo
ltages of the station AC prime power matches those marked on the ID label; it
is 198-264 V AC, 47-63 Hz, single phase, for this unit.
• The prime power station is properly grounded.
• All connections are tight, no wires are pinched, and no other hardware has been
loosened during handling.
• The main power switch on the prime power station is turned OFF.
• The RF Input and RF Output are connected to a matched source and a proper load
capable to withstand full CW RF power (see Electrical Specifications).
• The cooling fan is not obstructed.
CA
UTION: Failur
e to verify
to malfunction. Operating the SSPB before verifying these items m
these pre-power cond
itions may da
SSPBM-K100-BTE
mage th
e SSPB
or cause
ay also
void th
e warranty
Page 25