● Mounting Procedure
1. Insert the shaft into the Coupling.
2. Secure the Encoder.
Refer to the table for
the maximum
insertion lengths of
the shaft into the
Coupling.
3. Secure the Coupling.
4. Connect the power and I/O lines.
5. Turn ON the power and check the outputs.
2.3 Mounting (Encoder)
Do not secure the Coupling and
shaft with screws at this time.
Maximum insertion
Coupling
length
E69-C06B
5.5 mm
E69-C08B
6.8 mm
E69-C10B
7.1 mm
Coupling
Tightening torque
E69-C06B
0.25 N·m
E69-C08B
0.44 N·m
E69-C10B
0.44 N·m
Be sure to turn OFF the Encoder
before connecting the lines.
2-21