ABB CoriolisMaster FCM2000 Operating Instructions Manual page 16

Mass flowmeter
Hide thumbs Also See for CoriolisMaster FCM2000:
Table of Contents

Advertisement

Safety
Corrective maintenance work may only be performed by trained personnel.
Depressurize the device and adjoining lines or containers before removing the device.
Check whether hazardous materials are used as materials to be measured before opening
the device. Residual amounts of hazardous material may still be present in the device and
could escape when the device is opened.
As far as provided in the scope of the operational responsibility, check the following items
through a regular inspection:
− the pressure-carrying walls / lining of the pressure device
− the measurement-related function
− the leak tightness
− the wear (corrosion)
Pos: 5.35 /Sicherheit/Durchfluss/FCM2000/Hinweis Befestigungsschrauben (Zeichnung) @ 11\mod_1176983310593_3101.doc @ 84454 @
Fig. 6
1 Mounting screws
2 Tower
3 Inspection screws
Pos: 6 /======= Seitenumbruch ======== @ 0\mod_1126532365768_3101.doc @ 3830 @
16
CoriolisMaster FCM2000
1
2
3
G00391
D184B111U02