3.1.5 Commissioning
Start-up checklist
Do not connect power until you have gone through the checklist
below
1. Are the wetted components (gasket, flange and sensing
2. Does the information given on the nameplate correspond with
3. Ex d applications: Have you connected the equipotential
4. Ex i applications: Are you using an intrinsic barrier within
5. Did you install cable entries of the correct internal diameter
6. Do not use the earth terminal in the wiring compartment: use
3.2

The Compartment Cover

Viewport Cleaning: The viewport is made of Borosilicate glass
and can be cleaned with any common glass cleaning product
(e.g.: Windex™, Isopropyl alcohol, etc.) that is suitable for the
Class and Division rating of the specific system installation.
3.2.1 Opening the cover
Procedure
1. Unscrew cover stop, if applicable
2. Unscrew terminal compartment cover
3.2.2 Closing the cover
Warning: Ex d [ia] applications
Check that the terminal compartment cover is screwed tight and
the cover stop (if applicable) is fastened tightly to the cover.
element) resistant to the corrosive properties of the tank
product?
the application?
bonding system correctly?
the correct parameters?
so that there is a good seal around the cable? Are the
cable glands suitably certified per the application and the
hazardous area parameters?
the equipotential bonding system.