Figure 24. 2145 UPS-1U power cable retention bracket hardware
3. Place the bracket over the power supply inlets on the right rear of the 2145
4. Position the bracket with the power cable protruding through the rightmost slot
5. Secure the bracket in place with one screw on each side, as shown in Figure 25.
Figure 25. 2145 UPS-1U power cable retention bracket
48
IBM System Storage SAN Volume Controller: Hardware Installation Guide
UPS-1U, so that the two screw holes line up.
in the bracket.