Installing The Front End Of The Rail - IBM 2145UPS-1U Hardware Installation Manual

System storage san volume controller
Table of Contents

Advertisement

Figure 63. Installing the front end of the rail
90
IBM System Storage SAN Volume Controller: Hardware Installation Guide
2
1
1
Front bracket
2
Rack-mounting flange
3
Locating pins
7. Align the locating pins
flange.
8. Push the latch lock
the carrier. The latch-lock carrier slides toward the front of the rack and the
locating pins project through the holes that are in the front flange and in the
front rail bracket.
Important: Ensure that the locating pins are fully extended through the front
rail bracket.
3
3
with the holes that are in the rack-mounting
2
(Figure 64 on page 91) away from the rail to release

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents