IBM 2145UPS-1U Hardware Installation Manual page 168

System storage san volume controller
Table of Contents

Advertisement

Figure 92. Opening the front latch-lock carrier assembly
Figure 93. Opening the back latch-lock carrier assembly
130
IBM System Storage SAN Volume Controller: Hardware Installation Guide
3. Gently push the latch lock
1
lever
toward the far end of the rail (Figure 92). The latch-lock carrier
assembly slides against the spring tension.
1
1
1
Latch-lever
2
Latch-lock
4. Continue to slide the latch-lock carrier for approximately 13 mm (0.5 in). The
latch-lever engages a hole in the back bracket assembly and holds the
latch-lock carrier in the retracted position.
5. Push the back rail bracket
stops. The rail is now at its shortest adjustment.
3
2
1
Back rail bracket
2
Latch-lock
2
away from the rail as you move the latch
2
2
1
(Figure 93) toward the front of the rail until it
1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents