Installing The Redundant Ac Power Switch; Attaching The Mounting Plates To The Redundant Ac Power Switch - IBM 2145UPS-1U Hardware Installation Manual

System storage san volume controller
Table of Contents

Advertisement

Installing the redundant ac power switch

Use the redundant ac power switch to make the SAN Volume Controller cluster
more resilient to power failure.
DANGER
(L003)
or
The following topics describe the redundant ac power switch installation tasks in
the order that they must be performed.
1. Attach the mounting plates to the redundant ac power switch.
2. Label the cables.
3. Connect the power input cables to the redundant ac power switch.
4. Install the redundant ac power switch in the rack.
5. Connect the redundant ac power switch to the site power.
6. Test the redundant ac power switch to ensure that it automatically switches
Attaching the mounting plates to the redundant ac power
switch
Attach the mounting plates to the redundant ac power switch before you label the
cables.
download the hardware location chart and the cable connection table for the
customer to complete prior to installation.
Multiple power cords. The product is equipped with multiple power cords.
To remove all hazardous voltages, disconnect all power cords.
1
2
1
2
power supplies when the main power source fails or is restored.
Chapter 6. Installing the SAN Volume Controller 2145-8G4 hardware
37

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents