8. Press and hold the on/off button
panel indicators cycle through a startup sequence while the 2145 UPS-1U
conducts a self-test.
Figure 23. The 2145 UPS-1U front panel assembly
When the self-test is complete, the power-on indicator
indicators (
the 2145 UPS-1U. The 2145 UPS-1U is now in normal mode, and is charging its
battery. If the power-on indicator
the voltage range setting might not be correct. When a SAN Volume Controller
is connected to the 2145 UPS-1U, the SAN Volume Controller automatically
adjusts the voltage range setting. Take no action for this alarm condition unless
it persists for more than five minutes after a SAN Volume Controller has been
connected to this 2145 UPS-1U and powered on.
9. Repeat all of these steps to install additional 2145 UPS-1Us.

Installing the 2145 UPS-1U cable retention bracket

The 2145 UPS-1U cable retention bracket ensures that the power cable connection
between the 2145 UPS-1U and the SAN Volume Controller 2145-8G4 or the SAN
Volume Controller 2145-8F4 is stable.
Install the bracket after you have installed the power cable between the 2145
UPS-1U and the SAN Volume Controller 2145-8G4 or the SAN Volume Controller
2145-8F4 node.
You can attach the bracket by performing the following steps:
1. Install the power cable into the rightmost power supply on the rear of the 2145
UPS-1U.
2. Remove the bracket and the two screws (shown in Figure 24 on page 48) from
the packaging.
2
LOAD 2
LOAD 1
+ -
6
5
8
7
7
8
and
) illuminate to indicate that power is being supplied by
1
Chapter 6. Installing the SAN Volume Controller 2145-8G4 hardware
for approximately five seconds. The front
1
4
1
is flashing red and the alarm is sounding,
2
3
and the load
47