GE L90 Instruction Manual page 524

Line current differential system
Hide thumbs Also See for L90:
Table of Contents

Advertisement

CONTROL ELEMENTS
CHAPTER 5: SETTINGS
to
— These settings specify FlexLogic operands (per breaker pole) that supervise
BRK 1 FLSHOVR SPV A
BRK 1 FLSHOVR SPV C
the operation of the element per phase. Supervision can be provided by operation of other protection elements, breaker
failure, and close and trip commands. A six-cycle time delay applies after the selected FlexLogic operand resets.
— This setting specifies the time delay to operate after a pickup condition is detected.
BRK FLSHOVR PKP DELAY
5
5-338
L90 LINE CURRENT DIFFERENTIAL SYSTEM – INSTRUCTION MANUAL

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents