TESTING
3.2.
Slowly increase the current until the relay operates and note the pickup value. The theoretical value of
operating current below the breakpoint is given by the following formula, where P is the pickup setting and S
the Slope 1 setting (in decimal format):
3.3.
Repeat the above test for different slope and pickup settings, if desired.
3.4.
Repeat the above tests for Phases B and C.
4.
Minimum pickup test with local current and simulated remote current (pure internal fault simulation):
4.1.
Disconnect the local relay from the communications channel.
4.2.
Loop back the transmit signal to the receive input on the back of the relay.
4.3.
Wait until the CHANNEL and PFLL status displays indicate OK.
4.4.
Slowly increase the current until the relay operates and note the pickup value. The theoretical value of
operating current below breakpoint is given by the following formula:
where
TAP represents the CT Tap setting for the corresponding channel
4.5.
Repeat the above test for different slope and pickup settings, if desired.
4.6.
During the tests, observe the current phasor at
This phasor should also be seen at
with a phasor of twice the magnitude at
4.7.
Repeat the above tests for Phases B and C.
4.8.
Restore the communication circuits to normal.
Download the UR test software from the GE Grid Solutions website
support/ur/l90test.zip) or contact GE Grid Solutions for information about the UR current differential test program
that allows the user to simulate different operating conditions for verifying correct responses of the relays during
commissioning activities.

9.1.4 Local-remote relay tests

9.1.4.1 Direct transfer trip (DTT) tests
The direct transfer trip is a function by which one relay sends a signal to a remote relay to cause a trip of remote
equipment. The local relay trip outputs closes upon receiving a direct transfer trip from the remote relay. The test
procedure is as follows:
1.
Ensure that relay will not issue any undesired signals to other equipment and all previous tests have been completed
successfully.
2.
Cycle power off/on in both relays.
9
3.
Verify and record that both relays indicate In Service on the faceplate display.
4.
Make the following setting change in the
DIFFERENTIAL
CURRENT DIFF FUNCTION
5.
Verify and record that both relays have established communications by performing the following status check
thorough the
CHANNEL 1(2) STATUS
9-4
ACTUAL VALUES  METERING  87L DIFF CURRENT  TERMINAL 1(2) IA
SETTINGS  GROUPED ELEMENTS  LINE DIFFERENTIAL ELEMENT  CURRENT
menu of both relays:
: "Enabled"
ACTUAL VALUES  STATUS  CHANNEL TESTS
: "OK"
ACTUAL VALUES  METERING  87L DIFF CURRENT  LOCAL IA
ACTUAL VALUES  METERING  87L DIFF CURRENT  IA DIFF
(http://www.gegridsolutions.com/products/
menu:
L90 LINE CURRENT DIFFERENTIAL SYSTEM – INSTRUCTION MANUAL
CHAPTER 9: COMMISSIONING
is
1
Eq. 9-1
Eq. 9-2
.