1MRK 511 245-UUS -
650 series ANSI
Engineering Manual
Once the engineering of the IED is done, the results must be written to the IED.
Conversely some parts of the engineering information can be uploaded from the IED
for various purposes.
The connection between the physical IED and PCM600 is established via an Ethernet
link on the front or rear port on the IED.
Section 2
Engineering tool set
21