Inspection Of The Machine - ferrotec CARRERA Operation Manual

High-voltage power supply unit
Table of Contents

Advertisement

High Voltage Power Supply
Type: CARRERA
8.4

Inspection of the machine

Version 1.3_15 EN
After completing cleaning, maintenance and repair work:
1. Check that the protective conductor connections are firm.
2. Check that the work has been carried out properly and fully.
After checking and replacing spare and wearing parts make
sure that all safety systems are in working order..
If all the functions work properly, the electron beam
-
evaporator is handed over to the operating personnel.
NOTICE
51

Hide quick links:

Advertisement

Table of Contents
loading

Related Products for ferrotec CARRERA

Table of Contents