Operation Modes - ferrotec CARRERA Operation Manual

High-voltage power supply unit
Table of Contents

Advertisement

High Voltage Power Supply
Type: CARRERA
7.2

Operation modes

7.2.1
Operation
7.2.2
Switching on
Version 1.3_15 EN
The operating modes are described in the separate operating
instructions of the components of the operating system.
The high-voltage power supply unit can only be operated in
connection with a control unit of the corresponding vacuum
device with a built-in electron beam vaporizer and filament power
supply.
The system should be switched on as follows:
1. Check whether the fuses in the main fuse block of the high-
voltage power supply unit are properly connected.
2. Switch on the GENIUS control unit.
3. Switch on the main "On/Off" switch of the high-voltage power
supply unit.
Keep minimum time pause of 5 seconds between switching on
the mains supply and switching on high voltage.
4. Check for the green LED „Interlock" is lit.
Check the set value of emission current.
5. Switch on high voltage on the GENIUS control unit.
Observe instruction in operation manuals of the whole system.
NOTICE
NOTICE
NOTICE
44

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents