Installation - JLG t350 Service And Maintenance Manual

Hide thumbs Also See for t350:
Table of Contents

Advertisement

SECTION 4 - BOOM & PLATFORM
9. Install the bolt, keeper pin, and upper pivot pin
securing the platform pivot to the boom.
10. Install the bolt, keeper pin, and lower pivot pin
securing the platform pivot to the boom.

Installation

1. Lift the boom into position on the machine. Install
the pivot pin, keeper pin, and bolt securing the
boom to the turntable.
4-6
NOTE: The main boom weighs approximately 626 lbs. (284
kg).
2. Install the pivot pin, nut, and bolt securing the top of
the timing link to the boom.
3. Install the pivot pin, keeper pin, and bolt securing
the rod end of the lift cylinder to the boom.
4. Connect the hydraulic hoses at the rear of the tele-
scope cylinder as tagged during removal.
5. Install the master cylinder. Refer to Section 4.3, Mas-
ter Cylinder.
6. Operate the boom through all functions and check
for proper operation or any leakage.
– JLG Lift –
3121198

Advertisement

Table of Contents
loading

This manual is also suitable for:

T500j

Table of Contents