JLG t350 Service And Maintenance Manual page 121

Hide thumbs Also See for t350:
Table of Contents

Advertisement

3. Assemble the rotor (8A), counterbore down if appli-
cable, into stator (8B), and onto wear plate (9) with
rotor splines into mesh with drive link (10) splines.
NOTE: If the manifold side of the rotor was etched during
Torqlink disassembly, this side should be up. If the
rotor is not etched and does not have a counterbore,
use the drive link spline contact pattern apparent on
the rotor splines to determine the rotor side that must
be against the wear plate.
4. Assemble six vanes (8C), or as many vanes that will
readily assemble into the stator vane pockets.
EXCESSIVE FORCE USED TO PUSH THE ROTOR VANES INTO
PLACE COULD SHEAR OFF THE COATING APPLIED TO THE STA-
TOR VANE POCKETS.
5. Grasp the output end of coupling shaft (12) with
locking pliers or other appropriate turning device
and rotate coupling shaft, drive link and rotor to seat
the rotor and the assembled vanes (8C) into stator
(8B), creating the necessary clearance to assemble
3121198
SECTION 3 - CHASSIS & TURNTABLE
the seventh or full complement of seven vanes.
Assemble the seven vanes using minimum force.
6. Remove the two assembled bolts (1) if used to retain
stator and wear plate.
– JLG Lift –
3-85

Advertisement

Table of Contents
loading

This manual is also suitable for:

T500j

Table of Contents