EcoSystem Setup
After EcoSystem devices are wired and powered, they must be addressed before the
system can control them. The "Build System" command automates this process.
Note: All existing EcoSystem programming will be deleted when the "Build System"
command is run, including EcoSystem sensor programming on the GRAFIK Eye
QS control unit.

Building the System

1. Enter programming mode.
Main menu
2. Use the Master buttons to highlight "EcoSystem" and press the
Zone setup
OK button to accept.
EcoSystem
3. Use the Master buttons to highlight "Build system" and press
the OK button to accept.
4. Press the OK button to erase all current programming, reset
EcoSystem
and address EcoSystem devices, and find sensors on the
system.
Build system
5. Exit programming mode.
Assign zones
Note: After running "Build System", Zone 4 will control all
Build system
Erase digital load
Programming?
Searching...
x
Found
x Loads
Found
®
1
9
EcoSystem devices for diagnostics and verification
of wiring. (This feature is disabled once any of the
addressed devices are assigned to a zone on the
GRAFIK Eye QS control unit.) Use the Zone 4 raise/lower
buttons to verify that all devices are correctly addressed.
If a device does not respond, repeat the "Build System"
command and/or check the wiring.
For additional information, see the complete installation and operation guide at www.lutron.com/qs
GRAFIK Eye QS with EcoSystem Control Unit Quick Installation and Operation Guide 15
2
10
3
11
4
12
5
13
6
14
7
15
8
16
9-16
1-8
OK
1
9
2
10
3
11
4
12
Master
buttons
OK
button
Timeclock
(back) button
5
13
6
14
7
15
8
16
Use Zone 4
raise/lower
buttons to
verify all
1
EcoSystem
devices
have been
addressed.