Major Components And Accessories - Zip HydroTap G4 Celsius Installation Instructions Manual

Filtered boiling, chilled and chilled sparkling drinking water with unfiltered mixed hot and cold water for residential kitchens celsius residential series
Hide thumbs Also See for HydroTap G4 Celsius:
Table of Contents

Advertisement

Parts supplied
Tap options
Command-Centre
QUICK START GUIDE
STEP 1-
Prepare and fit the Taps
HydroTap Tap
All-In-One Tap
Note: This quick start guide must be read in conjunction with
(If required)
the main installation and user instructions
Before proceeding, read the installation and user instructions
For AIO mains and vented Taps
Check all the components are present and correct.
Check that you have all the necessary tools
Cut a 50mm hole in the bench / sink top.
Ensure the underbench can support the product weight when full of water,
(Check the specifications in the main book and allow an extra 5-8kg when full. )
Black plastic
SINK TOP
spacer
Before installing ensure the following have been provided at
50mm
the installation site:
ALL THREAD
ROD
Stainless
Sufficient space in the cupboard to install all of the undersink units in accordance
washer
with these Installation Instructions. Refer to technical specification for dimensions. If
NOTE: make sure the tap location will allow the nozzle to drain into the sink.
required, make allowance for a booster heater. (Refer to the main book, for detailed
SPIDER
installation instructions).
Fit the
CLAMP
BLACK
STAINLESS
STAINLESS STEEL
A potable water supply connection with isolating valve inside the cupboard within
PLASTIC
STEEL
reach of the flexible braided hose and positioned so that the connection point and the
WASHER
WASHER,
6mm
stop cock will not be obstructed when all the undersink units are installed.
SPACER
SPIDER CLAMP,
NUT
AND 6mm NUT.
For Zip HydroTap 160/125 &160/175 models, a 220-240Vac, 10A GPO will be
required. For Zip HydroTap 240/175 models, two 220-240Vac, 10A GPOs will be
SPIDER
required. (One GPO is for the Zip HydroTap and the other for the Booster heater).
CLAMP
NOTE: feed each of the three tubes and
NOTE: Check the cable lengths and outlet positions before proceeding.
electrical cable evenly in between the legs of
NUT
O-RING
A potable cold water supply with a minimum working pressure of 172kPa and a
the SPIDER CLAMP when installing.
maximum working pressure of 700kPa connected via an isolation valve.
35mm dia hole
BASE
For the mains pressure All-IN-ONE, both a hot and cold water supply will be required.
Hole positioning:
BLOCK
ALL
The undersink appliances must be mounted in upright positions as shown in the
Position the tap such that it dispenses into
the sink bowl with ample clearance for a cup or tea pot. Alternatively,
SPIDER
THREAD
O-RING
diagrams.
the tap could be mounted away from the sink using a Zip Font, avail-
ROD
SINK TOP
able as an accessory.
Sink
BASE
IMPORTANT!
Do not proceed with the installation if these
BLOCK
Apply a light smearing of silicon sealant
NUT
requirements are not met.
on the underside of the upper spacer to
USB
CABLE
ensure a watertight fi t.
Parts Supplied
Description
Parts Supplied
Description
Mixer Tap
Fit the O-ring to the underside of the AIO tap
4-in-1
(If required)
then pass all hoses through the 50mm hole.
1 off
Duct kit
1x Air Duct
Hydrotap Tap
1 x Mounting
and hoses
plate
Tap
Vent kit
O ring Base
1 off
1 x Kickboard
UPPER
UPPER RUB-
Undersink Unit
RUBBER
BER WASHER
with air and water-
louvre
WASHER
Chiller
1 x Door vent
Clear tube to Vent
connection
filter
louvre
LOWER RUBBER
BLUE
1 x front vent grill
NOTE: feed each of
WASHER
LOWER RUB-
the tubes and elec-
Boiler
BER WASHER
trical cable evenly in
connection
1 off
WASHER
WASHER
between the legs of
RED
1 x Restrictaflow
HydroTap
the BASE BLOCK
valve and Tee
Booster heater
NUT
SPIDER.
piece for Mixer
and hoses
BRAIDED
NUT
HOSE x 3
Taps
(Supplied with
White Hose
White ring
Blue ring on
240/175 models)
For HydroTap and Mixer taps
Ext. Mains
on LHS to
RHS mains IN to
cut a 35mm hole in the bench / sink top.
Mains in
Mixer IN
1 off Mains water
BENCH TOP
Blue band
connection hose
Mixer IN
From Mixer OUT to Tap - Vented version only
Ø35mm
Red band
Mixer Out
801600 - Zip Quick Start Guide - October 2013 - V1.06
Page 8 of 28

Major components and accessories

Description
1 x
Celsius Arc
Boiling or chilled or
chilled sparkling tap
1 x
Celsius Cube
Boiling or chilled or
chilled sparkling tap
and components
TM
Vent kit
(C ,CS models only)
1 x Outlet vent (C)
2 x Outlet vent (CS)
1 x Inlet vent
1 x
Command-Centre
with air and water
filters
1 x Mains water
connection hose
1 x T-piece &
adaptor
1 x User guide and
ZIP HydroTap
®
User Guide
Tap Operation...................(Pages 2-5)
1 x Quick start
LCD Screen & Menu .......(Pages 6-18)
Maintenance.................... (Pages 18-20)
Date of Installation.........
BC160/125G4
BC240/175G4
BCH160/125G4
BCH240/175G4
AV160/125G4
AN160/125G4
AV240/175G4
guide
AN240/175G4
1 x Installation
Affix Model Number Label
Here
801599
instruction
801599 - HydroTap User Guide - Nov 2013 UK - V1.05
Page 1 of 20
1 x
CO
gas cylinder
2
assembly
(CS models only)
Accessories
TM
*ZT200G4 kit to fit filters FL1100
802149UK Celsius residential - Installation instructions -Jan 2016 v2.03
Description
Scale filter
installation kit
*ZT200G4
Filter not included.
Replacement
internal 0.2 micron
filter
ZT402
1 X
CO
gas cylinder
2
ZT400
Recommended
water block
HE45004

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the HydroTap G4 Celsius and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents