Before installation
• Read the instructions and check if there is adequate space to mount all of the components.
• Note Not all fittings are supplied with the appliance kit. Isolation valves are not supplied.
• Check the mains water pressure is within min / max requirements (see page 9).
• Check the water quality to determine if extra filtration will be required.
• Note This product must be fitted to a potable water supply.
• Check the appliance rating plate and ensure correct power is available for the appliance.
• Check the under counter cupboard supporting the Command-Centre
weight of Command-Centre
Before commissioning
• Check the Command-Centre
• Check all plumbing fittings have been tightened.
• Ensure the outlet and vent pipes are positioned to drain correctly.
• Ensure there is adequate ventilation.
• Check all tubes and pipes from the Command-Centre
there are no sags or kinks in the hoses.
• Check all electrical connections are correct and that there are no loose wires.
Commissioning
• Flush the supply line before connecting.
• Turn on the water and check for leaks.
• Purge CO
.
2
• Flush the filters (this commences auto calibration).
• Where applicable, programme the Command-Centre
Page 4 of 28
Installation checklist
, when full of water.
TM
has been installed correctly.
TM
(see section 6)
to the tap have a constant rise and
TM
to suit the customer's requirements.
TM
802149UK Celsius residential - Installation instructions -Jan 2016 v2.03
is adequate for the total
TM
Need help?
Do you have a question about the HydroTap G4 Celsius and is the answer not in the manual?