Speed-Payload Correlation Chart
1) ESSD(Rod Type)Series
2.5
2
1.5
1.5
1
0.5
0
0
12
11
9
6
5
3
1
0
0
50
30
25
25
20
15
15
10
5
0
0
CAUTION
・
Operating speed is set at the value determined by the screw lead.
・
Vertical payload varies depending on speed, so be careful in selecting motor size and screw lead.
・
Provide support such as a linear guide in combination with the product so that lateral load and rotating
torque do not act on the piston rod.
・
Values in the above graphs vary depending on external conditions such as connecting method and frictional
resistance of the linear guide.
・
Do not apply shocks to the rod such as by banging it on an external mechanical stopper during work piece
transfer.
・
There are occasions where setting speed is not reached depending on stroke length and acceleration.
Vertical Payload
Lead6
20
40
60
Speed(mm/s)
Lead6
Lead12
5
Lead24
2
100 150 200 250 300 350 400
Speed(mm/s)
Lead6
Lead12
4
50
100
150
Speed(mm/s)
12
10
10
8
6
1
4
2
0
80
100
0
30
25
25
20
20
15
10
10
5
0.5
0
0
30
25
20
15
10
5
2
0
0
200
− 11 −
Horizontal Payload(Rough Value)
Lead6
20
40
60
Speed(mm/s)
Lead6
20
Lead12
10
50
100
150
200
250
Speed(mm/s)
Lead6
25
20
20
50
100
Speed(mm/s)
<SM-431049>
3
80
100
Lead24
5
300
350
400
Lead12
12
150
200
Need help?
Do you have a question about the ESSD Series and is the answer not in the manual?