Stator Ground - GE G30 Instruction Manual

Generator protection system 7.4x
Hide thumbs Also See for G30:
Table of Contents

Advertisement

GROUPED ELEMENTS
DIR POWER 1 CALIBRATION
when a small difference in VT and CT angular errors is to be compensated to permit more sensitive settings. This setting
virtually enables calibration of the directional power function in terms of the angular error of applied VTs and CTs. The
element responds to the sum of the
DIR POWER 1 STG1 SMIN
for the stage 1 of the element. The positive values imply a shift towards the operate region along the RCA line; the negative
values imply a shift towards the restrain region along the RCA line. See the Directional Power Sample Applications figure
for details. Together with the RCA, this setting enables a wide range of operating characteristics. This setting applies to
three-phase power and is entered in per-unit (pu) values. The base quantity is 3 x VT pu base x CT pu base.
For example, a setting of 2% for a 200 MW machine is 0.02 × 200 MW = 4 MW. If 13.8kV is line voltage and 10 kA is a
primary CT current, the source pu quantity is 239 MVA, and thus, SMIN needs to be set at 4 MW / 239 MVA = 0.0167 pu ≈
0.017 pu. If the reverse power application is considered, RCA = 180° and SMIN = 0.017 pu.
The element drops out if the magnitude of the positive-sequence current becomes virtually zero, that is, it drops below the
cutoff level.
DIR POWER 1 STG1 DELAY
applications for a synchronous machine, stage 1 is typically applied for alarming and stage 2 for tripping.
If the VTs are located on the high-voltage (HV) side of the transformer, then the source should be configured using
CTs that are also on the HV side. Correspondingly, if the VTs are located on the low-voltage (LV) side of the
transformer, then the source should be configured using CTs that are also on the LV side. In both cases, the CT
polarity should produce a positive power measurement when the machine is generating.
5

5.7.14 Stator ground

5.7.14.1 Menu
SETTINGS  GROUPED ELEMENTS  SETTING GROUP 1(6)  STATOR GROUND
 STATOR
 GROUND
5-242
— This setting allows the relay characteristic angle to change in steps of 0.05°. This is useful
DIR POWER 1 RCA
— This setting specifies the minimum power as defined along the relay characteristic angle (RCA)
— This setting specifies a time delay for stage 1. For reverse power or low forward power
Figure 5-133: Sensitive directional power logic
STATOR GROUND
SOURCE: SRC1
and
DIR POWER 1 CALIBRATION
Range: SRC 1, SRC 2, SRC 3, SRC 4
G30 GENERATOR PROTECTION SYSTEM – INSTRUCTION MANUAL
CHAPTER 5: SETTINGS
settings.