INPUTS/OUTPUTS
DIRECT INPUT 8 DEVICE ID
DIRECT INPUT 8 BIT NUMBER
DIRECT INPUT 8 DEFAULT STATE
DIRECT INPUT 9 DEVICE ID
DIRECT INPUT 9 BIT NUMBER
DIRECT INPUT 9 DEFAULT STATE
Now the three blocking signals are available in UR IED 1 as
communications or a device, the scheme is inclined to block (if any default state is set to "On"), or to trip the bus on any
overcurrent condition (all default states set to "Off").
Example 3: Pilot-aided schemes
Consider a three-terminal line protection application shown in the following figure.
5
Assume the Hybrid Permissive Overreaching Transfer Trip (Hybrid POTT) scheme is applied using the architecture shown as
follows. The scheme output operand
In this architecture, Devices 1 and 3 do not communicate directly. Therefore, Device 2 must act as a 'bridge'. The following
settings are applied:
UR IEC 1:
DIRECT OUT 2 OPERAND
DIRECT INPUT 5 DEVICE ID
DIRECT INPUT 5 BIT NUMBER
DIRECT INPUT 6 DEVICE ID
DIRECT INPUT 6 BIT NUMBER
UR IED 3:
5-290
: "3"
: "3"
: select "On" for security, select "Off" for dependability
: "4"
: "3"
: select "On" for security, select "Off" for dependability
Figure 5-164: Three-terminal line application
is used to key the permission.
HYB POTT TX1
Figure 5-165: Single-channel open-loop configuration
:
"HYB POTT
TX1"
: "2"
: "2" (this is a message from IED 2)
: "2"
: "4" (effectively, this is a message from IED 3)
,
DIRECT INPUT 7 ON
DIRECT INPUT 8 ON
G30 GENERATOR PROTECTION SYSTEM – INSTRUCTION MANUAL
CHAPTER 5: SETTINGS
, and
. Upon losing
DIRECT INPUT 9 ON

Hide quick links: