DIRECT INPUT AND OUTPUT COMMUNICATIONS
5.
Set the timing selection switches (channels 1 and 2) to the required timing modes (see description earlier).
6.
Replace the top cover and the cover screw.
7.
Re-insert the IEEE C37.94 module. Take care to ensure that the correct module type is inserted into the correct slot
position. The ejector/inserter clips located at the top and at the bottom of each module must be in the disengaged
position as the module is inserted smoothly into the slot. Once the clips have cleared the raised edge of the chassis,
engage the clips simultaneously. When the clips have locked into position, the module is inserted fully.
3
Modules shipped since January 2012 have status LEDs that indicate the status of the DIP switches, as shown in the
following figure.
3-44
Figure 3-52: IEEE C37.94 timing selection switch setting
G30 GENERATOR PROTECTION SYSTEM – INSTRUCTION MANUAL
CHAPTER 3: INSTALLATION