Getting Started; Preparation - ADLINK Technology ReadySystem 850 User Manual

1u computer system with readyboard 850 core 2 duo epic sbc
Table of Contents

Advertisement

2

Getting Started

The following chapter describes how to set up and operate the
ReadySystem™ 850.

2.1 Preparation

1. Unpack the contents of the shipping carton. Please
check that your package contains the items below. If you
discover damaged or missing items, please contact your
vendor.
ReadySystem 850
AC adapter (12V DC output)
2x power cords (US, EU)
Optional items:
Y-cable for PS/2 keyboard/mouse (P/N: 30-01016-0000)
DO NOT install or apply power to equipment that is damaged
or if there is missing/incomplete equipment. Retain the ship-
ping carton and packing materials for inspection. Please con-
WARNING:
tact your ADLINK dealer/vendor immediately for assistance.
Obtain authorization from your dealer before returning any
product to ADLINK.
2. Place the system on a flat work surface. Ensure there is
sufficient airflow clearance around the chassis.
To prevent damage to the system, ensure there is sufficient
clearance around the air vents for unrestricted airflow. The air
temperature inside the enclosure could rise above the speci-
CAUTION:
fied operating temperature limits if the airflow through the vents
is restricted.
Getting Started
RS-850
7

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ReadySystem 850 and is the answer not in the manual?

Table of Contents