MODULAR SAFETY INTEGRATED CONTROLLER MOSAIC
Result of the simulation
The graph shows the signals relating to the simulation, in this case:
which indicates closing of the gate.
when 3000 ms have
which indicates the request to start sent by the operator
to logic level 1.
The AND operator output signal is delayed by 2000 ms by the delay
operator.
The "Op7" retarder output signal sends the command to close the relay
when 5000 ms have elapsed, at which time the "M-press" relay is activated.
Figure 81 - Graph produced by the simulation of the application example
8540780 • 23/03/2017 • Rev.31
puts rise
163