Time And Items Required; Parts List - Brocade Communications Systems DCX Backbone Hardware Installation Manual

Table of Contents

Advertisement

Installing the 14U Rack Mount Kit for Four-Post Racks (XBR-DCX-0120 and XBR-DCX-0152)

Time and items required

Allow approximately one hour to unpack and install a device in a rack.
The following tools are required when installing the 14U Rack Mount Kit for Four-Post Rack:
Torque screwdriver with #2 Phillips screwdriver tip
Slotted (flat blade) screwdriver
Hydraulic or assisted lift with a minimum raise of 140 cm (55 in.) and a minimum capacity of 113 kg (250 lb)

Parts list

The following table lists 14U Rack Mount Kit parts and quantities for different installations. Refer to the illustration following the table to
identify these parts.
TABLE 4 14U rack mount kit parts and quantities
Description
Left rack mount shelf bracket (rail brackets may differ from ones shown in illustration)
Right rack mount shelf bracket (rail brackets may differ from ones shown in illustration)
10-32 x 5/8 in. (1.58 cm) panhead Phillips screw and washer (torque to 32 in-lb, [37 cm-
kg])
10-32 clip nut
1/4-20 x 1/2 in. (1.27 cm) panhead Phillips screw with lock washer (torque to 80 in-lb [92
cm-kg])
10-32 retainer nut
1/4-20 x 1/2 in. (1.27 cm) panhead Phillips screw with thread locker (torque to 80 in-lb [92
cm-kg])
3/8 in. (0.953 cm) alignment washer
NOTE
Depending on the device and installation, not all the parts may be used on the device type.
32
Installation
All
All
All
For rack rails with round holes
For rack rails with round holes
For rack rails with square holes
For rack rails with square holes
For rack rails with square holes
Brocade DCX Backbone Hardware Installation Guide
Quantity
1
1
6
6
16
6
16
16
53-1000685-24

Advertisement

Table of Contents
loading

Table of Contents