GE N60 Instruction Manual page 283

Ur series network stability and synchrophasor measurement system
Hide thumbs Also See for N60:
Table of Contents

Advertisement

5 SETTINGS
SETTING
PHASE OV1
FUNCTION:
Disabled = 0
Enabled = 1
SETTING
AND
PHASE OV1
BLOCK:
Off = 0
SETTING
PHASE OV1
SOURCE:
Source VT = Delta
VAB
VBC
VCA
Source VT = Wye
If the source VT is wye-connected, then the phase overvoltage pickup condition is
and V
.
CA
NOTE
GE Multilin
N60 Network Stability and Synchrophasor Measurement System
SETTINGS
PHASE OV1 PICKUP
SETTING
DELAY:
PHASE OV1
PHASE OV1 RESET
PICKUP:
DELAY:
RUN
t PKP
VAB PICKUP
RUN
t PKP
VBC
PICKUP
RUN
VCA PICKUP
t PKP
Figure 5–65: PHASE OVERVOLTAGE SCHEME LOGIC
5.6 GROUPED ELEMENTS
t RST
t RST
t RST
>
V
FLEXLOGIC OPERANDS
PHASE OV1 A PKP
PHASE OV1 A DPO
PHASE OV1 A OP
PHASE OV1 B PKP
PHASE OV1 B DPO
PHASE OV1 B OP
PHASE OV1 C PKP
PHASE OV1 C DPO
PHASE OV1 C OP
FLEXLOGIC OPERAND
PHASE OV1 OP
OR
FLEXLOGIC OPERAND
PHASE OV1 DPO
AND
FLEXLOGIC OPERAND
OR
PHASE OV1 PKP
827066A7.CDR
×
3
Pickup
for V
, V
,
AB
BC
5
5-167

Advertisement

Table of Contents
loading

Table of Contents