Mitsubishi Electric MELSEC iQ-R User Manual page 114

Bacnet module
Hide thumbs Also See for MELSEC iQ-R:
Table of Contents

Advertisement

7.
ExceptionSchedule[1] to ExceptionSchedule[n] are corresponding to the period from the first day to the last day of the
days on which an exceptional schedule is enabled.
Click the [Edit] button of an exceptional schedule to be set.
8.
Set the following items.
Item
Period
TimeValueList
Time
Data Type
Value
EventPriority
Temporary stop of scheduled operations
■ To stop all scheduled operations temporarily
Turn 'Schedule execution prohibited' (Y3) OFF to stop all the scheduled operations which are registered to a BACnet module.
(Page 250 Schedule execution prohibited (Y3))
■ To stop a specific scheduled operations temporarily
Set 'True' to the value of the OutOfService property of a Schedule object where the scheduled operation to be stopped
temporarily is set.
Precautions
A scheduled operation is restarted at the timing when 'Schedule execution prohibited' (Y3) is turned OFF or an OutOfService
property value is changed to 'False', and all the schedules which are not executed at the day are executed.
1 FUNCTIONS
112
1.1 BACnet Object Function
Description
When referring the date to perform scheduled operations from a Calendar object, enter the instance number of the
Calendar object to be referred to the rightmost textbox.
Select "Hour", "Minute", and "Second" to perform a scheduled operation.
Specify the data type of the property of an object for a scheduled operation.
For the data types of each property, refer to the list of properties for the respective objects.
Enter a value to be written to the property for a scheduled operation.
Set the priority to execute the schedule among 1 to 16 when the schedule is overlapped in one day.

Advertisement

Table of Contents
loading

Table of Contents