CHK
ADJ
Control system
2
1
14. Install the service lid.
NOTE:
Make sure that the throttle cable is not pulled
when the handlebar is turned to the right and
left.
Trolling speed check
1. Check:
• Trolling speed
Out of specification → Check the throttle
cable or throttle body assembly.
Checking steps:
1. Place the watercraft in the water.
2. Start the engine and allow it to warm up for
5 minutes.
3. Check the engine trolling speed using the
tachometer of the multifunction meter or
using the YDIS.
Trolling speed:
1,150–1,350 r/min
Shift cable check and adjustment
1. Check:
• Reverse gate position
Incorrect → Adjust the shift cable joint.
Checking steps:
1. Set the shift lever to the reverse position.
2. Check that the reverse gate 1 contacts
1
the stopper 2.
3-7
E