Performance; General - Fluke 93 Service Manual

Scopometer. philips pm93; pm95; pm97
Table of Contents

Advertisement

PERFORMANCE
VERIFICATrON
PROCEDURE
4-1
4
PERFORMANCE
VERIFICATION
PROCEDURE
4.1
GENERAL
INFORMATION
The ScopeMeter
should
be
calibrated
and
In
operating
condition
when
you
receive
It.
The
following
perfcxmance
tests
are provided
to
ensure
that
the
Scope
Meter
is in
a proper
operating
conditior>.
If
the Instrument
fails
any
of the
performance
tests,
calibration
adjustments
(see chapter
5)
and/or
repair
(see chapter
7)
is
necessary.
The
Performance
Verification
Procedure
described here
consists
of
two
parts:
Standard Performance
Verification
Procedure
(separate
SCOPE*
and METER*sectlon)
Additional
Performance
Verification
Procedure
The Standard Performance
Verlficalion
Procedure
uses
built-in
ScopeMeter
front
panel
settings
or
frontsetlings,
that
can be accessed
via
the
SERVICE MENU.
To
enter the
SERVICE MENU,
press
t»th
AC/DC/QROUND
keys
simuttaneously.
This
menu
allows
you
to
choose between
SCOPE
and
METER
performance
testing
("Verify").
Vrms
AC
0.058
V DC
+
0.012
C
HANNEL
A
AUlO
RANGE
10:1
30\
300V
2£kV
lOOms/ACQ
SERVICE:
V9fity
CALIBRATE
SCOPE
METER
EM
ScopeMetar EXIT
Figure
4.
1
Service
menu
lA/hen
the
Scope
Meter
is
in
SERVICE
mode,
only the softkeys, the select/adjust
keys
and
the
ON/OFF
key can
be
operated.
It
Is
possible
to
move
forward or
backward
through
the
frontsettings, that
apply
tc
the
separate
performance
test
steps.
This
can be done
using the
adjust/select keys.
You can
leave the
Performance
Verification
Procedure
any
time
by pressing the
EXIT
softkey.
The
Performance
Veiificallon
Procedure
steps are explained
in
the following sections.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

9596

Table of Contents