Fluke 93 Service Manual page 80

Scopometer. philips pm93; pm95; pm97
Table of Contents

Advertisement

PERFORMANCE
VERIFICATION
PROCEDURE
4-
11
Test set-up:
Procedure:
A
Apply
a
2
kHz
sine
wave
signal of
800
mV
peak-to-peaK
to
channel
A
and
channel
B.
Use 50^
terminations.
Adjust the Input signal
to
a
trace height of 8
divisions.
Requirements:
Verify that
a
line
with
an
angle
of
45°
is
displayed.
See
figure 4.8.
Figure 4.8
A
versus
8
display
21/22.
Base
line instability
This
test
checks
the
maximum
base
line instability.
Teat
equipment:
none
Test setup:
no
special
setup
required

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

9596

Table of Contents