PERFORMANCE
VERIFICATION
PROCEDURE
4-3
^/
2
.
LCD
test
While
In
the
SERVICE
menu,
press
the
SCOPE
softkey
to
enter the
SCOPE
section
of
the
Performance
Verification
Procedure.
Now
a
(dark)
test
pattern
is
displayed. This pattern consists
of
a
circle
placed
In
a
square,
and
a
diagonal
line
(see
figure
4.2).
Observe
the
test
pattern
closely.
The
lines
may
not
be
Interrupted;
the pattern
must be
continuous.
In this test
sets the c^splay
to
a
high
contrast, resulting
In
a
dark
display.
If
there
are
defects
In
the
pixel
columns
of
the
Liquid Crystal Display,
they
must
be
clearly visible
now
as
Intermissions
In
the
pattern.
After
you have checked
the
display,
press
the
upper
select/adjust
key once.
Now
an
oscilloscope
screen
is
displayed.
Figure 4.2
Test pattern
Press the
upper
select/adjust
key
again
to
go
to
step
2.
Now
the display
shows
the
same
pattern,
but with
a low
contrast
(bright
screen).
This
will
help
you
to
locate
any
failures
in
the
pixel
rows
of
the
LCD.
3.
Ground
level
check
P
ress
th
e
u
pper
se
lect/adj
u
st
key
to
go
to
step
3.
The
purpose
of this
step
is
to
check
the
ground
level
position
ddjusiments
(OV)
for
both
traces.
The
ScopeMeter
display
shows
th©
text
"
Verif
3",
to
show
that
this
is
the
third
SCOPE
Performance
Verif icatron
step (see
figure
4.3).
Requirements:
A tOOmV
OND
B tOOfnV
QNO
lOOus/OV
Trig:
A/
a
r
Ag
1
1
ser' VICE
1
Verity
CALIBRATE
S
METER
EiU
ScopeMeter
EXrT
Figure 4.3
Reference
set-up
Venfy
thal
the traces
of
both
channels
A
and B
are situated
on
the
vertical
middle
of
the screen.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

9596

Table of Contents