Installing the Symmetry and fixing to the frame
The Symmetry comes pre-assembled with the burner already in position. For all
installations the unit MUST BE positioned on a level surface
1. Position the unit inside the cavity.
2. Bend and secure the two metal standoffs
supplied with the unit into position on
top of the unit. These provide the 150 mm
vertical clearance to the upper lintel.
3. Fix the unit to the frame with the four
mounting brackets. These act as seismic
constraints as well as providing horizontal
clearance to the frame.
4. Install the glass front, this will help protect
the unit while the remaining installation
work is completed.
The carton in which the Symmetry is packaged has a cardboard cutout that is the same size as
the glass frame. This can be used to protect the unit during installation.
12 | RDV3611 installation guide: 11156-E 05-16
Step 2: Bend and secure the metal standoffs
Step 3: Fix the unit to the frame with the mounting brackets