Advanced Tab; Scheduler Submenu; Weekly Schedule - Banner SureCross DX80 Gateway Pro Reference Manual

Wireless i/o network system web configurator
Hide thumbs Also See for SureCross DX80 Gateway Pro:
Table of Contents

Advertisement

SureCross™ DX80 Web Configurator
Instruction Manual
Tip
Before setting any schedules,
verify the system's time and date
are accurately set in the System >
Setup > Time and Date tab.
Banner Engineering Corp. • Minneapolis, MN U.S.A.
www.bannerengineering.com • Tel: 763.544.3164

Advanced Tab

The Advanced tab contains options for scheduling, logging data, and setting up automatic alerts.

Scheduler Submenu

The Scheduler tab contains the pages for setting up weekly schedules, on demand schedules, and
any holidays requiring special schedules.

Weekly Schedule

Use the Weekly Schedule tab to manage weekly activities.
During the On Time, the On Value is applied to the given register. The remainder of the time, the
register is set to the Off Value. The On and Off Values are applied once at the start of the On
Time, when the system is rebooted, and when the system clock is changed (System > Setup >
Time and Date screen).
Astronomical Clock
The astronomical clock will not work unless latitude, longitude, and time zone are set in the Time
and Date tab.
To reference the astronomical clock instead of fixed time of day, enter DAWN or DUSK in place
of the HH:MM:SS on and off times. An offset in minutes may also be included. To specify one half
hour after sunrise, enter dawn+30. To specify one half hour before sunset, enter dusk-30, etc.
Upper/lower case is ignored, but do not include any spaces in the dawn/dusk string.
Duplicating and Schedule
Instead of duplicating a schedule entry to activate multiple outputs, make a single schedule entry
that applies to a single register then cascade that register to any number of other registers with
cascade rules set up on the System > Action Rules > Cascade page.
Weekly Schedule, Holidays Expanded View
Access the holiday expanded view by clicking the Holidays link on the main Weekly Schedule page.
The schedule entry affected shows on the first line. The remainder of the page allows you to add
and remove defined holidays from this schedule event.
Excluding Holidays
To exclude holidays from the scheduled event:
Select a holiday from the Available Holidays list.
1.
2.
Click the Add button.
Click on the Exclude radio button.
3.
Once a holiday is added to the schedule, the scheduled event that normally happens on the
selected days will not occur if one of the selected days falls on one of the excluded holidays.
Advanced Tab

P/N 134421

Advertisement

Table of Contents
loading

This manual is also suitable for:

Surecross dx83 ethernet bridge

Table of Contents