• Use acrylic latex caulk that is paintable. Caulk at all horizontal and vertical seams, between the trim and walls, and all
around the door trim.
• Use a high quality exterior acrylic latex paint. When painting your building, there are a few key areas that can be easily
overlooked that must be painted:
• Bottom edge of all siding and trim
• Inside of doors and all 4 edges
Note:
Prime all un-primed exterior wood before painting.
(Follow directions provided by manufacturer.)
• Install felt flush to all roof edges overlapping 3". Use minimal amount of roofing nails to hold in place.
You must install roof felt to validate warranty.
• Install drip edge over roof felt on side of shed and under roof felt on back side (Fig. A).
• Do not use nails on side of drip edge that hangs over side of building.
• Only nail top of drip edge as shown.
Drip Edge
flush to trim.
(Follow directions provided by manufacturer.)
You must install drip edge to validate warranty.
PAINT & CAULK
- NOT INCLUDED -
ROOF FELT
- NOT INCLUDED -
DRIP EDGE
- NOT INCLUDED -
Drip Edge
65
Flush
Flush
Roof Felt
Fig. A
SIDE
OF
SHED
Drip Edge
BACK
OF
SHED