Heartland 16826 Assembly Manual page 27

Metropolitan 12' x 7'-6"
Table of Contents

Advertisement

PARTS REQUIRED:
x2
BOA
2 x 4 x 93-3/16" (5,1 x 10,2 x 236,7 cm)
BEGIN
Rest one outer rafter on front and back wall doublers. Ensure rafter is flush to back wall
1
panel (Fig. A) and flush to end of back wall doubler (Fig. B).
Secure back of outer rafter using 3" screw installed centered into outer rafter end (Fig.
2
A) and afterwards toenailed into inside of rafter (Fig. B).
DO NOT OVER-DRIVE SCREW THROUGH PANEL.
Orient front of outer rafter flush to front wall panel (Fig. C) and flush to end of front wall
3
doubler (Fig. D).
Secure front of outer rafter using 3" screws installed centered into outer rafter end (Fig. C)
4
and afterwards toenailed into inside of rafter (Fig. D).
Flush
Flush
3" (7,6 cm)
Screw
toenailed
Fig. D
5
Repeat Steps 1-4 for opposite side outer rafter.
OUTER RAFTER INSTALLATION
3" (7,6 cm)
Screw
Fig. C
BOA
x8
Flush
Fig. B
25
3" (7,6 cm)
3" (7,6 cm)
Screw
BOA
3" (7,6 cm)
3" (7,6 cm)
Screw
Flush
Fig. A
3" (7,6 cm)
Screw
toenailed
Screw

Advertisement

Table of Contents
loading

Table of Contents