Page 1
16826 STOP! STOP! Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly or product information call our toll free number: 1-800-577-9663 or email: customerservice@backyardproductsllc.com Our staff is ready to provide assistance April through October M-F 8:00 AM to 4:30 PM EST...
16826 05/18/2015 ASSEMBLY MANUAL A Backyard Products Company METROPOLITAN 12' x 7'-6" (365,8 x 228,6 cm) ACTUAL FLOOR SIZE IS 144" x 90" (365,8 x 228,6 cm) KEEP THIS MANUAL FOR FUTURE REFERENCE IMPO RTA N T! READ INSTRUCTIONS THOROUGHLY PRIOR TO BEGINNING ASSEMBLY.
Page 4
TOOLS Required Optional Tool Belt/ ❑ ❑ Phillips ❑ Utility Knife Screwdriver Nail Pouch ❑ Shingle Blades Drill / Driver ❑ 1/4" Drill Bit ❑ ❑ Tin Snips ❑ Caulk Gun 3/8" Drill Bit ❑ (for drip edge) 1/2" Drill Bit ❑...
ADDITIONAL MATERIALS FOUNDATION OR FLOOR MATERIALS • This shed kit includes a complete wood floor system. • This shed kit does not include ANY leveling materials. • See the FLOOR LEVELING section on page 7 for recommended methods and suggested materials to properly level your floor, as this will vary depending on your specific site. REINFORCED WOOD FLOOR FRAME (OPTIONAL) IMPORTANT! The included floor has been designed for general use. Depending on your specific use you may want to construct a heavy duty floor frame by adding additional floor joists (shown below).
PARTS IDENTIFICATION AND SIZES Part identification WOOD SIZE CONVERSION CHART Nominal Board Size Actual Size letters are stamped on some parts. Treated lumber is stamped: 2" x 4"....1-1/2" x 3-1/2" (3,8 x 8,9 cm) 1" x 4"....3/4" x 3-1/2" (1,9 x 8,9 cm) 2" x 3"....1-1/2" x 2-1/2" (3,8 x 6,3 cm) Check these locations for 1"...
Page 7
PARTS LIST continued... 19/32 x 2-1/2 x 24-3/8" (1,5 x 6,3 x 61,9 cm) 19/32 x 2-1/2 x 41-1/4" (1,5 x 6,3 x 104,8 cm) 2 x 3 x 59-1/4" (5,1 x 7,6 x 150,5 cm) 2 x 3 x 72" (5,1 x 7,6 x 182,8 cm) 19/32 x 2-1/2 x 91"...
Page 8
WALL PANEL & DOORS PARTS LIST 3/8 x 23-7/8 x 96" 3/8 x 48 x 72" 3/8 x 48 x 84-3/4" 3/8 x 48 x 84" (1 x 60,6 x 243,8 cm) (1 x 113,3 x 121,9 cm) (1 x 122 x 215,3 cm) (1 x 122 x 215,3 cm) x1 3/8 x 48 x 96"...
Page 9
FLOOR LEVELING OPTIONS There are multiple ways to level your floor frame. Our recommended leveling method is shown below. Leveling materials are not included in this kit. PREFERRED METHOD - 4x4 TREATED RUNNERS • 3" Screws angled into 4x4. • (2) at each point frame •...
Page 10
CONCRETE FOUNDATION Your kit contains all materials to construct a wooden floor. If you choose to install your kit on a concrete slab refer to the diagram below. Treated Sill Plate Caulk between sill plate and concrete. 3-1/2" (8,9 cm) 4" (10,2 cm) Building Size Actual Size 12'x 7'-6" (365,8 x 228,6 cm) 144" x 90" (365,8 x 228,6 cm)
FLOOR FRAME PARTS REQUIRED: 3" (7,6 cm) 2 x 4 x 87" (5,1 x 10,2 x 221 cm) Look for TREATED 2 x 4 x 96" (5,1 x 10,2 x 243,8 cm) 2 x 4 x 48" (5,1 x 10,2 x 121,9 cm) Stamp BEGIN Orient parts as shown on flat surface.
Page 12
LEVEL AND SQUARE FLOOR FRAME Before attaching floor decking, it is important to level and square the floor frame. A level and square floor frame is required to correctly construct your shed. BEGIN See page 7 for the preferred floor leveling method. Use level and check the frame is level before applying floor panels.
Page 13
FLOOR PANELS PARTS REQUIRED: 2" (5,1 cm) 5/8 x 48 x 96" (1,6 x 121,9 x 243,8 cm) Ensure your floor frame is square by installing one panel and squaring frame. BEGIN Attach the 48 x 96" panel with the rough side up (painted-grid lines side) with the 48" edge and corner flush to the floor frame (Fig A). Secure panel with two 2" nails in the corners.
Page 14
FLOOR PANELS PARTS REQUIRED: 2" (5,1 cm) 5/8 x 42 x 96" 5/8 x 48 x 90" (1,6 x 106,7 x 243,8 cm) (1,6 x 60,6 x 122 cm) Continue installing panels with rough side up (painted grid lines). Use grid lines on panel for 2" nails 6" apart on edges, and 12" apart inside panels. FINISH You have finished attaching your floor panels.
Page 15
IMPORTANT! Check the floor frame is level after installing floor panels. Re-level if needed. • The floor should be used as a stable work surface for wall construction. • Organize your assembly procedure during the build process HINT: to avoid over-handling of the walls. Back wall Front wall...
Page 16
BACK WALL FRAME PARTS REQUIRED: 3" (7,6 cm) 2 x 4 x 48" (5,1 x 10,2 x 121,9 cm) 2 x 4 x 64" (5,1 x 10,2 x 162,5 cm) 2 x 4 x 96" (5,1 x 10,2 x 243,8 cm) BEGIN Orient parts on edge on floor.
Page 17
BACK WALL PANELS PARTS REQUIRED: 2" (5,1 cm) 3/4" GAUGE 48 x 72" BLOCK (121,9 x 213,4 cm) • Ensure your wall frame is square by installing one panel and squaring frame. • Ensure top of panel is overhanging the top of frame by 4". Place 48 x 72" panel onto wall frame with primed side up as shown. Use the gauge block to mark the 3/4" measurement on the wall stud. Secure panel with two 2"...
Page 18
BACK WALL PANELS PARTS REQUIRED: 2" (5,1 cm) 3/4" GAUGE BLOCK 48 x 72" (121,9 x 213,4 cm) Place center 48" x 72" panel on frame For squareness maintain 3/4" as shown with primed side facing up. measurement along panel edges. Nail using 2" nails 6" apart on edges Flush and 12"...
Page 19
FRONT WALL FRAME PARTS REQUIRED: 3" (7,6 cm) 2 x 4 x 16-1/2" (5,1 x 10,2 x 42 cm) 2 x 4 x 40" (5,1 x 10,2 x 101,6 cm) 2 x 4 x 57-5/8" (5,1 x 10,2 x 146,4 cm) 2 x 4 x 68"...
Page 20
FRONT WALL FRAME PARTS REQUIRED: 3" (7,6 cm) 2 x 4 x 16-1/2" (5,1 x 10,2 x 41,9 cm) Orient parts on edge as shown. Measure and mark. HINT: For easier nailing Use two 3" nails at each mark. stand on frame. 115-3/8" (293,1 cm) 57-3/8"...
Page 21
FRONT WALL PANELS PARTS REQUIRED: 2" (5,1 cm) 3/8 x 48 x 96" 3/4" GAUGE (1 x 121,9 x 243,8 cm) BLOCK Handle panels with care to avoid breakage. Handle panels with care to avoid breakage. Place 48 x 96" left panel primed side up onto wall frame centered in door opening as shown. • Ensure top of panel is overhanging the top of frame by 6". • Hold the 3/4" measurement along left edge of panel. Use a gauge block. Nail panel with two 2"...
Page 22
FRONT WALL PANELS PARTS REQUIRED: 2" (5,1 cm) 3/4" GAUGE 3/8 x 48 x 96" BLOCK (1 x 121,9 x 243,8 cm) 3" (7,6 cm) 2 x 3 x 69" (5,1 x 7,6 x 175,3 cm) TEMPORARY SUPPORT Place 48 x 96" right panel primed side up onto wall frame flush to left panel. • Hold the 3/4" measurement along right edge of panel. Use a gauge block.
Page 23
FRONT WALL PANELS PARTS REQUIRED: 2" (5,1 cm) 3/8 x 23-7/8 x 96" (1 x 60,6 x 243,8 cm) Place 23-7/8 x 96" panel onto wall frame flush to left 48 x 96" panel with primed side up as shown. • Ensure top of panel is overhanging the top of frame by 6". Nail the panel using 2"...
BACK WALL INSTALLATION PARTS REQUIRED: 3" (7,6 cm) TEMPORARY 2 x 4 x 80-11/16" (5,1 x 10,2 x 204,9 cm) 3" (7,6 cm) 2" (5,1 cm) BEGIN Stand backwall on floor. It is important to secure the backwall in the following order. ENSURE 4" MEASUREMENT IS AT TOP OF BACK WALL ASSEMBLY.
Page 25
FRONT WALL INSTALLATION PARTS REQUIRED (TEMPORARY): 3" (7,6 cm) 2 x 4 x 93-3/16" (5,1 x 10,2 x 236,7 cm) 3" (7,6 cm) 2" (5,1 cm) BEGIN Stand front wall on floor. Center front wall assembly on the 144" front floor dimension. Use (2) BOA as temporary braces.
Page 26
DOUBLER INSTALLATION PARTS REQUIRED: 3" (7,6 cm) 2 x 4 x 48" (5,1 x 10,2 x 122 cm) 2 x 4 x 57-5/8" (5,1 x 10,2 x 146,4 cm) 2 x 4 x 96" (5,1 x 10,2 x 243,8 cm) 2 x 4 x 86-1/4" (5,1 x 10,2 x 219,1 cm) BEGIN For back wall, orient parts on flat on top of wall frame.
Page 27
OUTER RAFTER INSTALLATION PARTS REQUIRED: 3" (7,6 cm) 2 x 4 x 93-3/16" (5,1 x 10,2 x 236,7 cm) BEGIN Rest one outer rafter on front and back wall doublers. Ensure rafter is flush to back wall panel (Fig. A) and flush to end of back wall doubler (Fig. B). Secure back of outer rafter using 3"...
Page 28
OUTER RAFTER INSTALLATION PARTS REQUIRED: H 2.5 Tie Plate 2" (5,1 cm) Attach tie plates with 2" nails as shown. 2" (5,1 cm) Nails FINISH You have finished installing your outer rafters.
Page 29
RAFTERS PARTS REQUIRED: 3" (7,6 cm) 2 x 4 x 93-3/16" (5,1 x 10,2 x 236,7 cm) BEGIN Starting at end as shown, measure and mark location of each rafter. Place rafter on front and back wall doublers. Line up rafter centered with marks. Ensure rafter is flush to back wall panel (Fig. A) and flush down on top of back wall doubler (Fig. B).
Page 30
OUTER RAFTER INSTALLATION PARTS REQUIRED: H 2.5 Tie Plate 1-1/2" (3,8 cm) Attach (9) tie plates with 1-1/2" nails as shown. • Attach far left tie plate reversed position from others (Fig. A). 1-1/2" (3,8 cm) Nails • HINT: Look for the"Simpson" name on the tie plate. Fig. A RIGHT LEFT FINISH You have finished installing your rafters.
Page 31
SIDE WALL PANELS PARTS REQUIRED: 3" (7,6 cm) TEMPORARY SUPPORT 1-1/2 x 2-1/2 x 69" (3,8 x 6,3 x 175,3 cm) 2" (5,1 cm) 1-1/2" (3,8 cm) 3/8 x 42 x 96" 3/8 x 42 x 96" 3/8 x 48 x 84-3/4" 3/8 x 48 x 84-3/4"...
Page 32
SIDE WALL PANELS (continued) PARTS REQUIRED: 1-1/2" (3,8 cm) 2" (5,1 cm) Place 48 x 84-3/4" panel onto side wall flush with bottom of 42 x 96" panel with primed side up, as shown. Secure panel with 2" nails in three corners (Fig. E). Ensure the measurement between the panel edges are the same along the entire length (Fig. B).
Page 33
SIDE WALL STUDS PARTS REQUIRED: 3" (7,6 cm) 2 x 4 x 72-5/8" (5,1 x 10,2 x 184,5 cm) TEMPORARY GUIDE 2 x 4 x 80-11/16" (5,1 x 10,2 x 204,9 cm) 2 x 4 x 16-1/2" (5,1 x 10,2 x 41,9 cm) 2 x 4 x 86-1/8"...
Page 34
SIDE WALL PANELS PARTS REQUIRED: 1-1/2" (3,8 cm) Measure, align and mark side wall studs 24" from center of panel seam as shown. Nail side wall panels to inside wall studs using 1-1/2" nails 6" apart along panel seam and 12" apart in middle of panels as shown. 20"...
Page 35
STOP CHOOSE YOUR SIDE WALL WINDOWS LOCATION AT THIS TIME. WINDOWS ON LEFT WINDOWS ON RIGHT SIDE WALL SIDE WALL SIDE WALL WINDOW FRAMING PARTS REQUIRED: 3" (7,6 cm) 2 x 4 x 16-1/2" (5,1 x 10,2 x 41,9 cm) BEGIN Choose the side wall you want to install your windows on. From inside, measure and mark locations of (4) RD. Secure with 3" screws. Angle nail to hit RD 3-1/2"...
Page 36
SIDE WALL WINDOW CUTOUT PARTS REQUIRED: 3/8" (1,0 cm) Drill Bit Using a 3/8" drill bit, drill a hole through both wall panels in each corner of window framing. Pre-drill hole 3/8" (1.0 cm) From outside, mark straight lines connecting the holes. Cut along lines using a saw. Carefully trim panel openings after cutting as necessary. FINISH You have finished preparing your SIDE WALL for window installation.
Page 37
ROOF PANELS PARTS REQUIRED: 2" (5,1 cm) 7/16 x 11-7/8 60-1/4" 7/16 x 11-7/8 x 96" (1,1 x 30,2 x 244 cm) 30,2 152,7 (1,1 x Roof panels may cause serious injury until securely fastened. BEGIN Place the 11-7/8 x 96" lower roof panel with the rough side up (painted-grid lines side) with 2-7/8" overhang from back wall panel (Fig A).
Page 38
ROOF PANELS PARTS REQUIRED: 2" (5,1 cm) 3/4" GAUGE 7/16 x 48 x 96" BLOCK (1,1 x 121,9 x 244 cm) Roof panels may cause serious injury until securely fastened. You must square the roof by attaching one 48 x 96" panel at this time. You will use the panel's long edge as a lever to bring your roof into square.
Page 39
ROOF PANELS PARTS REQUIRED: x167 2" (5,1 cm) 7/16 x 11-7/8 x 96" 7/16 x 48 x 96" (1,1 x 30,2 x 244 cm) (1,1 x 121,9 x 244 cm) Nail the first 48 x 96" roof panel using 2" nails 6" apart Flush on edge and 12"...
Page 40
RAFTER EXTENSIONS PARTS REQUIRED: 2" (5,1 cm) 2 x 3 x 10-1/2" (5,1 x 7,6 x 26,7 cm) BEGIN Line up each rafter extension BRA 90 degrees square with rafters as shown. Secure rafter extensions with screws through roof panels (Fig. A). •...
Page 41
SIDE RAKE FRAMING PARTS REQUIRED: 2" (5,1 cm) 1 x 3 x 33 - 1/8" (2,5 x 7,6 x 84,1 cm) 1 x 3 x 72" (2,5 x 7,6 x 182,8 cm) BEGIN Align BPA edge flush with rafter extension BRA (Fig A). Attach with (3) 2" nails (Fig B). Attach HJ flush with BPA with (5) 2"...
Page 42
SIDE SOFFIT PARTS REQUIRED: 2" (5,1 cm) 3/8 x 5-1/4 x 95-1/2" (1 x 13,3 x 242,5 cm) BEGIN Attach 95-1/2" soffit BR primed side down flush to front wall panel (Fig. A). Secure to side rake frame BPA using (7) 2" finish nails (Fig. A, B). Fig. A Flush FRONT WALL...
Page 43
FRONT SOFFIT PARTS REQUIRED: 2" (5,1 cm) 3/8 x 10-3/8 x 75-1/2" (1 x 26,3 x 191,8 cm) 3/8 x 10-3/8 x 79-5/8" (1 x 26,3 x 202,2 cm) BEGIN Attach 75-1/2" soffit primed side down under rafter extensions BRA flush to side wall soffit (Fig. A). Ensure soffit is flush to front wall panel.
Page 44
FRONT FASCIA TRIM PARTS REQUIRED: 2" (5,1 cm) 19/32 x 3-1/2 x 60-3/8" (1,5 x 8,8 x 153,4 cm) 19/32 x 3-1/2 x 96" (1,5 x 8,8 x 243,8 cm) BEGIN Measure 1/4" past left roof panel and line up HHA primed side out and flush up under roof panels (Fig. A).
Page 45
SIDE FASCIA TRIM ASSEMBLY PARTS REQUIRED: 2" (5,1 cm) 19/32 x 3 - 1/2 x 59 - 1/4" (1,5 x 8,8 x 150,4 cm) 2 x 3 x 33-1/8" (5,1 x 7,6 x 84,1 cm) 19/32 x 3 - 1/2 x 59 - 1/4" (1,5 x 8,8 x 150,4 cm) 19/32 x 3-1/2 x 48"...
Page 46
SIDE FASCIA TRIM PARTS REQUIRED: 2" (5,1 cm) LEFT FASCIA ASSEMBLY 2" (5,1 cm) RIGHT FASCIA ASSEMBLY BEGIN Place left side fascia assembly between roof sheathing and side soffit (Fig. A). Hold left side fascia assembly tight to front fascia trim (Fig. B). Secure fascia assembly under roof panels flush with front fascia board using (7) 2" screws through roof sheathing (Fig. A).
Page 47
REAR FASCIA TRIM PARTS REQUIRED: 3" (7,6 cm) 19/32 x 3-1/2 x 59-1/2" (1,5 x 8,8 x 151,1 cm) 2" (5,1 cm) x1 ZX 19/32 x 3-1/2 x 96" (1,5 x 8,8 x 243,8 cm) 2" (5,1 cm) x1 GKA 2 x 3 x 59-1/2" (5,1 x 7,6 x 151,1 cm) x1 PT 2 x 3 x 96"...
Page 48
BACK CORNER TRIM PARTS REQUIRED: 2" (5,1 cm) 3/8 x 2 x 68-3/4" (0,9 x 5,1 x 174,6 cm) 3/8 x 2 x 69-1/4" (0,9 x 5,1 x 175,8 cm) 3/8 x 2 x 69-1/4" (0,9 x 5,1 x 175,8 cm) ¸...
Page 49
SIDE CORNER TRIM PARTS REQUIRED: 2" (5,1 cm) 3/8 x 2 x 93-1/4" (0,9 x 5,1 x 236,8 cm) 3/8 x 2 x 93-1/4" (0,9 x 5,1 x 236,8 cm) ¸ BEGIN Attach 93-1/4" side corner trims on both sides flush with front wall panel. Use (6) 2"...
Page 50
FRONT FRIEZE TRIM PARTS REQUIRED: 2" (5,1 cm) 3/8 x 2 x 72" (0,9 x 5,1 x 182,9 cm) 3/8 x 2 x 73-3/8" (0,9 x 5,1 x 186,4 cm) ¸ BEGIN Attach 72" and 73-3/8" front horizontal frieze boards using 2" finish nails evenly spaced as shown (Fig. A).
Page 51
FRONT CORNER TRIM PARTS REQUIRED: 2" (5,1 cm) 3/8 x 2 x 91-1/4" (0,9 x 5,1 x 231,7 cm) ¸ BEGIN Attach both vertical 91-1/4" front corner trim on both sides, flush to edge of installed side trim using (6) 2" finish nails evenly spaced in each trim board (Fig. A, B, C). Fig. B Fig. A Flush...
Page 52
DOORS PARTS REQUIRED: 3" (7,6 cm) 1-1/2 x 2-1/2 x 69" (3,8 x 6,3 x 175,3 cm) 1-1/4" (3,2 cm) HINT: Look for 3/8" SPACER attached to doors. x1 GAA 1 x 3 x 5" (2,5 x 7,6 x 12,7 cm) Left Door Right Door BEGIN Orient parts as shown on flat surface.
Page 53
DOORS PARTS REQUIRED: 3" (7,6 cm) 1-1/2 x 2-1/2 x 69" (3,8 x 6,3 x 175,3 cm) Attach temporary support OO as a ledger board flush under wall panels for doors to rest on using 3" screws (Fig. A). Flush against wall panels Fig. A Center doors on panel seam as shown (Fig. B).
Page 54
DOOR TRIM PARTS REQUIRED: 2" (5,1 cm) 64" Metal Threshold 3/4" (1,9 cm) 19/32 x 2-1/2 x 26-5/8" (1,5 x 6,3 x 67,6 cm) Bagged separately / special coating 3/4" (1,9 cm) 19/32 x 2-1/2 x 55-7/8" (1,5 x 6,3 x 141,9 cm) BEGIN Secure hinge boards from inside using 3/4"...
Page 55
DOOR WEATHERSTRIP PARTS REQUIRED: 2" (5,1 cm) 1-1/2 x 2-1/2 x 69" (3,8 x 6,3 x 175,3 cm) BEGIN Center OO vertically on the left door in the door opening flush with the edge of door (Fig. A). Secure using (5) 2" screws through outside trim into OO (Fig. B) Repeat Steps 1-2 to install OO on right door.
DOOR HARDWARE PARTS REQUIRED: 1/2" (13 mm) Drill Bit 1/4" (6 mm) Drill Bit BEGIN Measure and mark location of hole on outside of right door as shown (Fig. A) . Pre-drill hole with 1/4" drill. Re-drill hole with 1/2" drill (Fig. B) . Keep drilled hole square to trim to avoid breaking edge of 1-1/2"...
DOOR HARDWARE PARTS REQUIRED: 3-Point Door Locking Mechanism Handle (locking) with Screws 1-1/4” x2 3/4” Tech Screw with drill point 1-1/4” x8 1/2" (13 mm) Drill Bit 1-1/4” x2 1/4" (6 mm) Drill Bit Secure backplate with 1" screws and handle with 1-1/4" screws as shown. RIGHT DOOR Screw Backplate 1/2” DRILL THROUGH 1-1/4" Wood Screw 1-1/4" Pre drill for Pan Head screws. Screw 1-3/4" (4,4 cm) 1/2"...
Page 58
DOOR HARDWARE See following pages for mounting locations of brackets and plates. Plate Washer 1-1/4" Pan Head Screw UPPER BRACKET 3/4" Tech (with offset) Screw Orient bracket as shown. Washer 3/4" Tech Screw Washer LOWER BRACKET (without offset) Orient bracket as shown. 1-1/4" Pan Head Screw Washer Plate...
Page 59
DOOR HARDWARE TOP of Door 2-1/4" IMPORTANT! This rod to edge of door RIGHT DOOR LEFT DOOR Make sure rods are straight up and down when locating brackets. 2-1/4" BOTTOM of Door...
Page 60
DOOR HARDWARE Drill with 3/8" bit PLATE to 2" depth. FRAMING Align Plates with vertical rod points. Drill-thru with 3/8" drill bit to 2" depth into header and floor. VERTICAL RODS FLOOR PLATE...
Page 61
FRONT WINDOWS PARTS REQUIRED: 3/4" (1,9 cm) 9" x 27" (22,8 x 68,5 cm) ¸ BEGIN Apply high quality exterior-grade caulk behind frame near edge before installing to seal window. From outside of shed, position window in center of opening and level. Use two screws at top of windows.
Page 62
FRONT WINDOWS PARTS REQUIRED: 2" (5,1 cm) 19/32 x 2-1/2 x 91" (1,5 x 6,3 x 231,1 cm) 19/32 x 2-1/2 x 9" (1,5 x 6,4 x 22,9 cm) Center BSA over door. Secure using (7) 2" finish nails as shown. Do not nail into window flange.
Page 63
FRONT WINDOWS PARTS REQUIRED: 3/4" (1,9 cm) Install (12) 3/4" screws from inside, as shown. Do not screw into window flange. Install 3/4" (1,9 cm) screws from inside. FRAMING BEYOND INSIDE OF SHED Install 3/4" (1,9 cm) screws from inside. FINISH You have finished installing your window.
SIDE WINDOWS PARTS REQUIRED: 2" (5,1 cm) Window 16-1/4" x 22-1/4" (41,3 x 56,5 cm) 2" (5,1 cm) 19/32 x 2-1/2 x 41-1/4" (1,5 x 6,3 x 104,8 cm) BEGIN Mark center of window frames as shown. CENTER CENTER Seal windows with high-quality exterior- grade caulk before installing.
Page 65
SIDE WINDOWS PARTS REQUIRED: 2" (5,1 cm) 19/32 x 2-1/2 x 24-1/2" (1,5 x 6,3 x 62,2 cm) 19/32 x 3-1/2 x 24-3/8" (1,5 x 8,8 x 61,9 cm) 19/32 x 2-1/2 x 41-1/4" (1,5 x 6,3 x 104,8 cm) Center CY flush with JFA. Secure with (3) 2" finish nails. 2"...
Page 66
VENTS PARTS REQUIRED: 1/2" (1,3 cm) 8 x 16" (20,3 x 35,6 cm) ¸ BEGIN Locate and mark for two vents in side walls as shown. (1) at top and (1) at bottom Cut out marked openings. Caulk behind vent flanges. Secure using 1/2"...
Page 67
PAINT & CAULK - NOT INCLUDED - • Use acrylic latex caulk that is paintable. Caulk at all horizontal and vertical seams, between the trim and walls, and all around the door trim. • Use a high quality exterior acrylic latex paint. When painting your building, there are a few key areas that can be easily overlooked that must be painted: •...
Page 68
SHINGLES - NOT INCLUDED - • Follow directions provided by manufacturer and these instructions. Familiarize yourself with a 3-Tab Shingle. Notch Notch SHINGLE NAIL PATTERN 1/2" 1" Sealing Strip 1" (1,3 cm) (2,5 cm) (2,5 cm) Half A Rain Slot Full Rain Slot NAILS NEVER DRIVE FASTENERS INTO OR ABOVE SEALING STRIPS. ¸ BEGIN Install first starter row upside down, color up and flush to drip edge at bottom of roof panel. Use (4) nails per shingle. Starter row must be straight and level all the way across with lower edge of roof deck.
Page 69
SHINGLES continued... Install second row of shingles flush at top of first row's rain slots. Ensure flush to drip edge at front side, stagger each row. DOOR Notch BACK OF SHED Flush with rain slots. Flush with rain slots. 1" (2,5 cm) Continue installing rows of shingles by staggering at front. Notch BACK OF SHED Continue installing rows of shingles to the front of the shed.
Page 70
SHINGLES - DRIP EDGE Install drip edge over top shingle row with 1" overhang over roof edge. 1" (2,5 cm) Using your shingle hooked blade carefully cut shingles on a flat surface along the rain slots, using a chalk line for reference. Align remaining shingles with edge of the front drip edge.
Page 71
WARRANTY Backyard Storage Solutions, LLC warrants the following: Limited Conditional Every product is warranted from defects in workmanship and manufacturing for one year. Warranty * All hardware and metal components are warranted for two years. Trim is warranted for 10 years. Waferboard siding and sheathing is warranted for two years.