Schedule; Day Of Week Block - Resource Data Management PR0750-TDB Installation & User Manual

Intuitive mercury tdb controller
Table of Contents

Advertisement

Intuitive Mercury 6-5M Controller with TDB

Schedule

Icon
Start
End
Num Per Day
1 Days

Day of Week Block

Warning
Ensure that all power is
switched off before
installing or maintaining
this product
The Schedule block can be used to signal a number of events
every specified number of days. The Mercury 2 TDB controller's real time
clock is used to determine the current time.
Start:
End:
Output
Num per Day:
Days:
Start and End time can span midnight e.g. Start 22:00 End 03:00
Icon
Output = 0 = Sunday
Output = 1 = Monday
Output = 2 = Tuesday
Output = 3 = Wednesday
Output = 4 = Thursday
Output = 5 = Friday
Output = 6 = Saturday
Properties
Enter the initial start time. The Output will activate when this time is
reached. Note the output is only active for 1 second.
Enter the last scheduled start time. The Output will activate when this time
is reached. Note the output is only active for 1 second.
Enter the number of events required per day.
If more than two events occur in a single day then the total number of
events will be evenly spaced including the Start and End times. Please
see example below.
Start
End
Num Per Day
In the above example the output would be active at 13:00, 14:00, 15:00
and 16:00 hours. Note if only 1 event per day is entered then the output
will trigger on the "Start" parameter
Enter the frequency of the events in days. For example if the "Number Per
Day" is set to 2 and the "Days" parameter is set to 3 then every 3 days the
output will be active twice. Once at the entered Start time and again at the
End time. Note the schedule takes effect from the last TDB program save.
Set to 1 if you wish the schedule to occur every day.
Properties
Revision 2.6
13:00
16:00
4
Page 36 of 53
www.resourcedm.com

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pr0751-tdbPr0760-tdbPr0761-tdb

Table of Contents