Flush-Front Mounting - Brocade Communications Systems G620 Hardware Installation Manual

Hide thumbs Also See for G620:
Table of Contents

Advertisement

Ensure that the items listed and illustrated above are included in the kit. Note that not all parts may be used with certain installations
depending on the device type.

Flush-front mounting

Observe the following notes when using this procedure:
The device must be turned off and disconnected from the fabric during this procedure.
The illustrations in this document show a 1U device, but the instructions are the same for a 2U device.
The illustrations for this procedure show a two-post rack with narrow posts (3- to 5-inch) as an example.
The illustrations in the rack installation procedures are for reference only and may not show the actual device.
CAUTION
Use the screws specified in the procedure. Using longer screws can damage the
device.
Complete the following tasks to install the device in a rack:
1.
Attaching the front brackets to the device
2.
Attaching the front brackets to the rack
3.
Attaching the rear brackets to the rack
4.
Attaching the rear brackets to the device
Attaching the front brackets to the device
Complete the following steps to attach the front brackets to the device.
1.
Position the right front bracket with the flat side against the right side of the device, as shown in
2.
Insert four 8-32 x 5/16-in. flathead screws through the vertically aligned holes in the bracket and then into the holes on the
side of the device. Use the upper and lower screw holes, leaving the center holes empty.
3.
Repeat step 1 and step 2 to attach the left front bracket to the left side of the device.
Brocade G620 Hardware Installation Guide
53-1003990-06
on page 41
on page 42
on page 43
on page 44
Installing the Universal Two-Post Rack Kit (XBR-R000294)
Figure
16.
41

Advertisement

Table of Contents
loading

Table of Contents