Time And Items Required; Parts List - Brocade Communications Systems G620 Hardware Installation Manual

Hide thumbs Also See for G620:
Table of Contents

Advertisement

Installing the Universal Two-Post Rack Kit (XBR-R000294)
Observe the following when mounting this device:
Two people are required to install the device in a rack. One person should hold the device, while the other while the other screws
in the front and rear brackets.
Hardware devices illustrated in these procedures are only for reference and may not depict the device you are installing into the
rack.

Time and items required

Allow 15 to 30 minutes to complete the installation.
The following items are required to install the device using the Universal Two-Post Rack Kit:
#2 Phillips torque screwdriver
1/4-inch slotted-blade torque screwdriver

Parts list

The following parts are provided with the Universal Two-Post Rack Kit Installation (XBR-R000294).
FIGURE 15 Rack kit parts
1.
Front brackets (2)
2.
Rear brackets, 3-5 inch post (2)
3.
Rear brackets, 5-6 inch post (2)
4.
Screw, 8-32 x 5/16-in., panhead Phillips (8)
40
5.
Screw, 8-32 x 5/16-in., flathead Phillips (16)
6.
Screw, 6-32 x 1/4-in., panhead Phillips (8)
7.
Screw, 10-32 x 5/8-in., panhead Phillips (8)
8.
Retainer nut, 10-32 (8)
Brocade G620 Hardware Installation Guide
53-1003990-06

Advertisement

Table of Contents
loading

Table of Contents