Verifying the operation of new transceivers

4.
Position a cable so that the key (the ridge on one side of the cable connector) is aligned with the slot in the transceiver. Insert the
cable into the transceiver until the latching mechanism clicks.
Cables are keyed so that they can be inserted in only one way. If a cable does not slide in easily, ensure that it is correctly
oriented.

Verifying the operation of new transceivers

You can use the following commands to verify if the transceivers are working correctly:
sfpShow
switchShow
errDump
fabricShow
Refer to the Brocade Fabric OS Command Reference for output examples and descriptions.