TABLE 5 Installation prerequisites
Task
Unpack the device.
Gather necessary components and
required tools.
Review the safety precautions.
Plan the installation.
Review and verify installation requirements.
Gather network configuration parameters.

Installation and initial configuration

The initial setup includes mounting the device on a flat surface or in a rack and completing the configuration tasks necessary to bring the
device online and verify the operation.
TABLE 6 Installation and basic system configuration
Task
Mount the device.
Check the airflow of the power supply and
fan assembly
Gather all components required for the
initial setup.
Provide power to the device.
Attach a management station, establish a
serial connection, and change the default
passwords (optional).
Brocade G620 Hardware Installation Guide
53-1003990-06
Task details or additional information
Take an inventory of the hardware components included in your shipment. Refer to
Shipping carton contents
on page 22.
Review the time and items required information at the beginning of each chapter to
ensure you have gathered all necessary components required for the following installation
tasks:
Mounting the Device
Power Supply and Fan Assembly
Installing Transceivers and Cables
Refer to
Safety precautions
on page 17. For translations, refer to
Notices
on page 89 at the end of this guide.
Decide whether you want to install the unit on a flat surface or in a rack. For rack
installation, obtain the appropriate rack mount kit. Refer to
25.
Verify that the following requirements are met. Refer to
Power requirements
Environmental requirements
Clearance for standalone or rack installation
IP address:
Subnet mask:
Default gateway:
Domain ID:
Time zone:
Task details or additional information
Choose one of the following mounting options:
Mount the device as a standalone unit. Refer to
26.
Mount the device in a four-post rack. Refer to
Rack Kit (XBR-R000296)
Mount the device in a two-post rack. Refer to
Rack Kit (XBR-R000294)
The airflow direction of the power supply and fan should match. The power supplies and
fan trays are clearly labeled with either a green arrow with an "E", or an orange arrow with
an "I." For more details, refer to
Refer to
Items required
on page 51.
Refer to
Providing power to the device
Refer to
Establishing a first-time serial connection
task, log in to the serial port to configure the device.
on page 25
on page 71
on page 59
Mounting options
Facility requirements
Standalone installation
Installing the Universal Four-Post
on page 26.
Installing the Universal Two-Post
on page 39.
Identifying the airflow direction
on page 51.
on page 52. After completing this
Quick installation checklist
Cautions and Danger
on page
on page 20.
on page
on page 73.
Completed
Completed