Installation; Time And Items Required - Brocade Communications Systems DCX-4S Backbone Hardware Installation Manual

Hide thumbs Also See for DCX-4S Backbone:
Table of Contents

Advertisement

Installation

Time and items required................................................................................................. 23

Preparing for Brocade DCX-4S installation.....................................................................24
Unpacking and installing the Brocade DCX-4S...............................................................25
Items included with the Brocade DCX-4S....................................................................... 26
Providing power to the Brocade DCX-4S........................................................................27
Port numbering................................................................................................................27
Chassis slots................................................................................................................... 28
Cable management.........................................................................................................28
Time and items required
You can set up and install the Brocade DCX-4S in the following ways:
• As a standalone unit on a flat surface.
• In a chassis with the DCX-4S Port Side Exhaust Kit (provided) in a Brocade-qualified rack.
• In a 19-in. Electronic Industries Association (EIA) cabinet, using a Brocade DCX-4S Rack Mount Kit
(either a 27-31 in. or 18-24 in. kit depending on rack used).
• In a mid-mount telecommunications (Telco) rack, using the Brocade DCX-4S Mid-Mount Rack Kit
available from your Brocade DCX supplier (optional).
This chapter describes how to set up the Brocade DCX-4S as a standalone unit. For rack-mount
installation instructions, refer to the appropriate manual as described in the following table.
The following table describes the main installation and setup tasks and the estimated time required for
each, and the items required to complete the task based on a fully populated Brocade DCX-4S (256
Fibre Channel ports). Configurations with fewer ports require less time. These time estimates assume a
prepared installation site and appropriate power and network connectivity.
TABLE 3
Installation task
Site preparation and unpacking
Brocade DCX-4S.
Installing the rack mount kit or port
side exhaust kit.
Mounting and securing Brocade
DCX-4S in rack.
Brocade DCX-4S Backbone Hardware Installation Guide
53-1001191-15
Installation tasks, time, and items required
Time estimate Items required
30 minutes
30 minutes
30 minutes
1/2-in. socket wrench (to remove pallet bolts).
#2 Phillips screwdriver.(for cable management comb).
Pallet jack.
Hydraulic lift or assisted lift, able to rise to a minimum of 140
cm (55 in.), with a minimum capacity of 113 kg (250 lb). The
Brocade DCX-4S weighs 68 kg (150 lb) with four FC8-64 port
cards installed (256 ports).
Refer to the one of the following if you are mounting the
Brocade DCX-4S in a rack:Brocade Port Side Exhaust Kit
Installation ProcedureBrocade DCX-4S Mid-Mount Rack Kit
Installation Procedure orBrocade DCX-4S Rack Kit
Installation Procedure .
23