Panel Carrier Assembly; Panel Restraints; Install The Restraints To The Rail - Genie GS-1930 Operator's Manual

Scissor lift
Hide thumbs Also See for GS-1930:
Table of Contents

Advertisement

Operator's Manual
Operating Instructions

Panel Carrier Assembly

Panel restraints

1
Install the panel clamp in the housing, using
springs and washers in the order shown.
Install the cotter pin under the lower washer.
2
Repeat for the second housing.
a
b
c
d
e
f
g
a
panel clamp
b
spring 1
c
washer 1
d
housing
e
spring 2
f
washer 3
g
cotter pin
64

Install the restraints to the rail

1
Install the clamp and housing on the side of
the machine without the platform extension
locks. Position the clamps as far apart as
appropriate for the load.
2
Using the 6 bolts and nuts provided, install the
clamp and housing to the scissor lift rails.
Install bolts and nuts in the order noted.
3
Apply the warning decal to the front of each
panel cradle (if needed)
4
Repeat for the second clamp and housing.
a
b
c
a
b
c
d
e
f
g
h
GS-30 • GS-32 • GS-46 • GS-47
Sixth Edition • Ninth Printing
2 bolts and nuts - install first
2 bolts and nuts - install second
2 bolts and nuts - install third
housing with clamp
platform rail
cover plate
rail clamp
decal
g
f
e
d
Part No. T107026

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents