Installation; Regulations Governing Installation; Package List; Standard Delivery - REMEHA CALORA TOWER GAS 15S EX Installation And Service Manual

Floor-standing high efficiency gas boiler
Table of Contents

Advertisement

CALORA TOWER GAS 15S EX CALORA TOWER GAS 25S EX
CALORA TOWER GAS 35S EX
5

Installation

5.1

Regulations governing installation

5.2

Package list

22/04/2016 - 300026141-001-07
WARNING
Installation of the appliance must be done by a qualified
engineer in accordance with prevailing local and national
regulations.
5.2.1.

Standard delivery

The delivery includes:
4 The boiler, fitted with an earthed mains plug
4 Attachment for C-mix optional PCB
4 Sticker with details on gas type
4 Installation and Service Manual
4 User Guide
5.2.2.

Accessories

Various options are available depending on the configuration of the
installation.
4 Boiler - DHW tank connection kits
4 Central connection kit - right / left
4 Mixing valve kit for integration DHW tank
4 Connection kit for external mixing valve
4 Fitting for circulating pipe
4 Flue kit
4 Flue gas adapters for concentric 80/125 mm or eccentric 80/80
mm connection
4 iSense programmable control system for modulating boiler
control (Cable on RF)
4 C-mix control PCB
4 Outside sensor
4 Flue gas temperature sensor
4 Electronic boards for extension
4 DHW expansion vessel
4 Propane conversion kit
5. Installation
17

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Calora tower gas 25s exCalora tower gas 35s ex

Table of Contents