Roland udk20 Manual page 59

Double sheet detector
Hide thumbs Also See for udk20:
Table of Contents

Advertisement

B0048991 / Rev. 1.3
5.2.5
Connection of Central plug
The supply voltage as well as the PLC inputs / outputs are connected via the central plug.
Fig. 22: Central plug
5.2.5.1
Connection to Machine grounding
The control unit must be connected to the central machine grounding by a cable with a cross-
section of at least 1,5 mm²
5.2.5.2
Supply voltage cable
The voltage supply cable should be kept short. Up to 20 m length use cable leads with 2 x 1 mm²
cross-section. For larger lengths the cross section should be increased.
ROLAND ELECTRONIC GmbH · Otto-Maurer-Str. 17 · DE 75210 Keltern · Phone +49 (0)7236-9392-0 · Fax +49 (0)7236-9392-33
Double Sheet Detector R1000 series UDK20
Attention
The positive supply voltage +24 VDC should not be connected to
machine ground.
Attention
The positive supply voltage +24 VDC should not be connected to
machine ground.
Manual
A1
C1
A2
B2
C2
A3
B3
C3
A4
B4
C4
A5
B5
C5
A6
B6
C6
A7
B7
C7
A8
B8
C8
A9
C9
Electrical installation
59

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents