Section 4
Setting up a project
4.5
24
IEC05000609 V1 EN
Figure 11:
PCM600: Create a new project window
5.
Name the project and include a description (optional) and click Create.
6.
PCM600 sets up a new project that will be listed under Projects on my
computer.

Building a plant structure

The plant structure is used to identify each IED in its location within the substation
organization. It is a geographical image of the substation and the bays within the
substation. The organization structure for the IEDs may differ from the structure of
the primary equipment in the substation. PCM600 has the possibility to set up a
hierarchical structure of five levels for the IED identification.
Build up the plant structure according to the project requirements. PCM600 offers
several levels to build the hierarchical order from Center down to the IEDs in a bay.
The following levels are available:
1.
Project = Center
2.
Substation = Name of the substation
3.
Voltage Level = identifies to which grid type or part in the substation the IED
belongs to
4.
Bay = Bay within the voltage level
5.
IED = selection of the IED, which is used in the bay. Several IEDs are possible
within a bay, for example one control IED and two protection IEDs.
1MRK511240-UEN B
en05000609.vsd
670 series
Engineering Manual