ABB Relion 670 series Engineering Manual page 92

Hide thumbs Also See for Relion 670 series:
Table of Contents

Advertisement

Section 9
DNP3 communication engineering
86
1.
Save the actual project configuration in PCM600 to make all signals visible for
CMT.
2.
Right-click the IED in the plant structure and select Communication
Management to start the Communication management tool.
3.
Select the DNP3 protocol from the new window and click OK.
presents the design of the two container windows, which open after the
selection of DNP3.
The right window shows tabs for possible communication channels.
The left window has a drop down menu for signal selection and buttons
for signal movement, see
IEC09000722 V1 EN
Figure 63:
CMT: Container window design when selecting DNP3 protocol
Procedure to move signals:
1.
Select one or several signals.
Click in the list of signals to select one signal.
Press Shift or Ctrl and several signals to select a set of signals.
Right-click in the list of signals, select Select All from the context menu
or press Ctrl+A to select all signals.
2.
Press the blue arrow button to insert the selected signals into the configuration.
3.
Press the green double arrow button to insert all signals into the configuration,
see
Figure
64.
Figure
63.
1MRK511240-UEN B
Figure 63
IEC09000722-1-en.vsd
670 series
Engineering Manual

Advertisement

Table of Contents
loading

Table of Contents