CSP−900RMM−2
11. Flow Control Shutoff Valve Assembly (900
CONFIG)
A. Flow Control Shutoff Valve Assembly
Removal
(Ref. Figure 404)
(1). Open R260 (Ref. Section 06-00-00).
(2). Disconnect electrical connector P520
(16).
(3). Disconnect flexible couplings (13) and
retainers (12) from shutoff valve (17).
Remove shutoff valve.
(4). Keep spacer fittings (14). Remove and
discard seals (15).
Page 412
Revision 28
MD Helicopters, Inc.
Rotorcraft Maintenance Manual
21-40-00
B. Flow Control Shutoff Valve Assembly
Installation
(Ref. Figure 404)
(1). Install flexible coupling seals (Ref.
Threadless Flexible Coupling Seal
Installation).
(2). Put shutoff valve in its installed
position.
(3). Install flexible coupling assemblies,
spacers, and retainers on shutoff valve.
(4). Connect electrical connector P520.
(5). Close R260 (Ref. Section 06-00-00).