Baggage Closet Tube Installation; Keel Beam To Floor Tube Removal; Keel Beam To Floor Tube Installation; Floor To Keel Beam Tube Removal - MD Helicopters MD Explorer Servicing And Maintenance

Table of Contents

Advertisement

CSP−900RMM−2
(3). Disconnect tube (11) from unions (8).
(4). Remove screw (3), washer (2), and
clamp (1). Remove tube (11).
P. Baggage Closet Tube Installation
(Ref. Figure 409)
NOTE:
Installation of forward or aft baggage
closet tube is the same.
(1). Connect tube to unions.
(2). Install clamp, screw, and washer.
(a). Torque screw.
(3). Torque tube nuts 230 to 260 in-lb
(25.99 to 29.37 Nm).
The receiver dehydrator must
CAUTION
be replaced each time the com­
pressor is removed, or the AC system is
opened. An early failure of the compressor
can occur.
(4). Remove and replace the receiver
dehydrator (ref. Procedure 22.).
(5). Service AC system (ref. Section
12-00-00).
(6). Install baggage compartment right
closeout panel and insulation (ref.
Section 25-00-00).
Q. Keel Beam to Floor Tube Removal
(Ref. Figure 409)
(1). Remove baggage compartment right
outboard floor panel (ref. Section
53-20-00).
(2). Evacuate AC system (ref. Section
12-00-00).
(3). Disconnect tube (9) from unions (8).
Remove tube (9)
R. Keel Beam to Floor Tube Installation
(Ref. Figure 409)
(1). Connect tube to unions.
(2). Torque tube nuts 230 to 260 in-lb
(25.99 to 29.37 Nm).
Page 436
Revision 34
MD Helicopters, Inc.
Rotorcraft Maintenance Manual
21-50-00
The receiver dehydrator must
CAUTION
be replaced each time the com­
pressor is removed, or the AC system is
opened. An early failure of the compressor
can occur.
(3). Remove and replace the receiver
dehydrator (ref. Procedure 22.).
(4). Service AC system (ref. Section
12-00-00).
(5). Install baggage compartment right
outboard floor panel (ref. Section
53-20-00).
S. Floor to Keel Beam Tube Removal
(Ref. Figure 409)
(1). Remove baggage compartment right
outboard floor panel (ref. Section
53-20-00).
(2). Evacuate AC system (ref. Section
12-00-00).
(3). Disconnect tube (10) from unions (8).
(4). Remove tube (10)
T. Floor to Keel Beam Tube Installation
(Ref. Figure 409)
(1). Connect tube (10) to unions (8).
(a). Torque tube nuts 230 to 260 in-lb
(25.99 to 29.37 Nm).
The receiver dehydrator must
CAUTION
be replaced each time the com­
pressor is removed, or the AC system is
opened. An early failure of the compressor
can occur.
(2). Remove and replace the receiver
dehydrator (ref. Procedure 22.).
(3). Service AC system (ref. Section
12-00-00).
(4). Install baggage compartment right
outboard floor panel (ref. Section
53-20-00).
U. Condenser to Keel Beam Tube Removal
(Ref. Figure 409)
(1). Remove baggage compartment floor
center panel (ref. Section 53-20-00).

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Csp-900rmm-2Mdhi md900

Table of Contents